SORANI K.K. Electrical work TEL+81-463-51-6638 Weekdays 9:00 to 18:00 (JST)
日本語English
Contact us

A new building at night whose lights come on one after another, starting at the entrance (illustrative image)

Kanagawa · Chiba · Tokyo · Saitama

We build the paths electricity takes.

The path of electricity

  • Cubicle substation (power receiving)Substation
  • 1Feeders (EPS)Feeders
  • 2Common panel → common-area lightingCommon areas
  • 3Panel in each unitUnit panels
  • 4Lighting and outletsLights & outlets

Move your mouse to light up a floor.Tap a number

Based in Hiratsuka, we carry out electrical installation for large-scale buildings: apartment buildings, commercial facilities, warehouses, factories, research facilities and hotels.

From the substation to the lights in every unit.

From the high-voltage service and the cubicle substation, through the feeders, to every floor and every unit: conduit, wiring, fixtures and connections.

Until the day the lights come on.

We stay with the job until it is finished.

Service area
Kanagawa, Chiba, Tokyo and Saitama(Based in Hiratsuka, Kanagawa)
Buildings
Apartment buildings, commercial facilities, warehouses, factories, research facilities and hotels
How we are engaged
Contract work for general contractors and first-tier subcontractors
Phone
+81-463-51-6638Weekdays 9:00 to 18:00 (JST)

SORANI’s strengths

Every strength comes with its proof: licensed staff by number, site-entry paperwork and registration, and a record of the work that finishes will hide. Only what you can check for yourself.

  1. Licensed electricians do the work.

    Licensed staff do the work. We list how many people hold each license, with the date of the figures.

    Proof People per license As of October 2026

    • First-Class Electrician 1 person
    • Second-Class Electrician 5 people
    • First-Class Electrical Construction Management Engineer 1 person
    • High-Voltage Cable Work Skills Certification 1 person
  2. Paperwork that never holds up the site.

    We prepare and submit safety documents on Green Site, Buildee and GreenFile.work. The company and every employee are registered in the Construction Career Up System (CCUS).

    Proof Documents, registration, insurance

    • Safety documents: Green Site, Buildee, GreenFile.work
    • CCUS (Construction Career Up System): company and all employees registered
    • Insurance: health (Japan Health Insurance Association), employees’ pension, employment, workers’ accident compensation
  3. Hidden work, kept in photos.

    We photograph slab conduit, ceiling wiring and other work that finishes will hide, before and after installation, with a digital site board, and hand the photos to the general contractor. What we shoot and how the photos are organized follow the contractor’s and the site’s requirements.

    Proof What we photographExample

    • Slab conduit
    • Wiring above the ceiling
    • Boxes inside the wall

Services

From the high-voltage intake to the very last light.

Receiving and transforming equipment, feeders and power, lighting and outlet circuits, light fixtures: from high voltage to low, we install the electrical systems of large buildings in step with the construction schedule. For low-voltage and fire-safety systems, we handle the conduit and wiring.

  1. An outdoor cubicle (packaged high-voltage substation) inside a mesh fence (illustrative image)
    Illustrative image

    Buildings

    • Apartment buildings
    • Commercial facilities
    • Warehouses
    • Factories
    • Research facilities
    • Hotels

    Power receiving and transforming

    From the high-voltage intake to the cubicle: where power enters the building.

    Power arrives from the utility at high voltage, and the cubicle (a packaged high-voltage substation) steps it down for use in the building. We lay the conduit and cables for the high-voltage intake, connect them to the cubicle and link it to the feeders on the secondary side.

    Typical tasks

    • High-voltage intake conduit
    • High-voltage cable laying
    • Cable terminations
    • Connection to the cubicle
    • Secondary feeder connection

    Our part

    1. Conduit(done by SORANI)
    2. Wiring(done by SORANI)
    3. Fixtures(done by SORANI)
    4. Termination(done by SORANI)
    5. Testing Specialist(done by a specialist contractor)

    We measure insulation resistance, continuity and earth resistance. High-voltage withstand tests and completion tests are carried out by a specialist firm.

  2. Feeder cables rising on a cable ladder inside an electrical shaft (EPS) (illustrative image)
    Illustrative image

    Buildings

    • Apartment buildings
    • Commercial facilities
    • Warehouses
    • Factories
    • Research facilities
    • Hotels

    Feeders and power

    From the cubicle to the panels on every floor: the trunk of the building.

    We lay feeder cables from the cubicle to the distribution and power panels on each floor. The work runs from installing cable trays, through risers in the electrical shaft (EPS) and pulling, dressing and fixing the cables, to terminating them at the panels. We also wire power equipment such as elevators and air conditioning units.

    Typical tasks

    • Cable tray installation
    • Feeder laying and dressing
    • Risers in the electrical shaft (EPS)
    • Termination at panels
    • Wiring to power equipment

    Our part

    1. Conduit(done by SORANI)
    2. Wiring(done by SORANI)
    3. Fixtures(done by SORANI)
    4. Termination(done by SORANI)
    5. Testing(done by SORANI)
  3. Outlets in a row on the wall above a laboratory bench (illustrative image)
    Illustrative image

    Buildings

    • Apartment buildings
    • Commercial facilities
    • Warehouses
    • Factories
    • Research facilities
    • Hotels

    Lighting and outlet circuits

    Lighting and outlet circuits, exactly to the drawings.

    We run conduit and wiring circuit by circuit, from the distribution panel to the lights, switches and outlets of each room. During the structural stage we cast conduit and boxes into slabs and walls; during the interior stage we wire inside ceilings and partitions; at the finishing stage we mount the switches and outlets.

    Typical tasks

    • In-slab and in-wall conduit
    • Ceiling wiring and supports
    • Wiring inside partitions
    • Box installation
    • Switches and outlets

    Our part

    1. Conduit(done by SORANI)
    2. Wiring(done by SORANI)
    3. Fixtures(done by SORANI)
    4. Termination(done by SORANI)
    5. Testing(done by SORANI)
  4. Rows of LED lights on the high ceiling of a warehouse (illustrative image)
    Illustrative image

    Buildings

    • Apartment buildings
    • Commercial facilities
    • Warehouses
    • Factories
    • Research facilities
    • Hotels

    Light fixtures

    Every fixture, exactly where the drawings put it.

    We mount and connect downlights, base lights, high-bay LED lighting and exterior lighting. We also wire lighting control such as dimming, occupancy sensors and timers.

    Typical tasks

    • Fixture mounting and connection
    • High-ceiling installation
    • Exterior lighting
    • Control signal wiring
    • LED retrofits

    Our part

    1. Conduit(done by SORANI)
    2. Wiring(done by SORANI)
    3. Fixtures(done by SORANI)
    4. Termination(done by SORANI)
    5. Testing(done by SORANI)
  5. Steel conduit and boxes run exposed on a concrete ceiling; inside one box, cable is left coiled for connecting the device (illustrative image)
    Illustrative image

    Buildings

    • Apartment buildings
    • Commercial facilities
    • Warehouses
    • Factories
    • Research facilities
    • Hotels

    Low-voltage and fire-safety conduit and wiring

    We build the routes and the wiring, right up to the devices.

    We install conduit and wiring for low-voltage and communication systems such as LAN, shared TV reception and intercom, and for fire-safety systems such as fire alarm, emergency broadcast, emergency lighting and exit signs. Fire-resistant and heat-resistant cables go in as the specification and drawings require, and we hand over to the specialist contractors who mount and connect the devices.

    Typical tasks

    • Low-voltage conduit and trays
    • LAN and coaxial cabling
    • Intercom cabling
    • Conduit and wiring to detectors
    • Fire-resistant cable laying

    Our part

    1. Conduit(done by SORANI)
    2. Wiring(done by SORANI)
    3. Fixtures Specialist(done by a specialist contractor)
    4. Termination Specialist(done by a specialist contractor)
    5. Testing Specialist(done by a specialist contractor)
  6. A tenant space under renovation, protected with sheeting, with a ceiling panel removed for lighting and wiring work (illustrative image)
    Illustrative image

    Buildings

    • Apartment buildings
    • Commercial facilities
    • Warehouses
    • Factories
    • Research facilities
    • Hotels

    Renovation and tenant work

    Changes and additions after completion, too.

    We carry out electrical fit-out work ordered by tenants (known in Japan as C-work) and additions or changes after completion, from surveying existing circuits to removal, adding circuits and switching them over. We also work in buildings that stay open or occupied, at night and on holidays when needed.

    Typical tasks

    • Survey of existing circuits
    • Removal of old equipment
    • Adding and switching circuits
    • Wiring inside tenant units
    • LED retrofits

    Our part

    1. Conduit(done by SORANI)
    2. Wiring(done by SORANI)
    3. Fixtures(done by SORANI)
    4. Termination(done by SORANI)
    5. Testing(done by SORANI)

Pick a kind of work to see what it involves. (Click, or the up and down arrow keys)

Tap a kind of work to see what it involves.

  • Buildings we work on

    Electrical installation for large-scale buildings, suited to how each one is used.

  • A large apartment building at dusk, its open corridors and entrance lit (illustrative image)

    Apartment buildings

    New builds and renovations

  • A large shopping centre at dusk, its atrium and parking deck lit (illustrative image)

    Commercial facilities

    New builds and renovations

  • A large logistics warehouse at dusk, its window bands and truck berths lit (illustrative image)

    Warehouses

    New builds and renovations

  • A factory at dusk, its office block and the hall behind the open door lit (illustrative image)

    Factories

    New builds and renovations

  • A research centre at dusk, its laboratory floors and entrance lobby lit (illustrative image)

    Research facilities

    New builds and renovations

  • A large city hotel at dusk, its guest rooms and entrance lit (illustrative image)

    Hotels

    New builds and renovations

How we think

The hidden parts get the most care.

The plasterboard is up, open only at the switch and outlet boxes, the holes for the downlights and the cables for the distribution panel (illustrative image) Boarding (illustration)
The finished entrance hallway with the lights off: the switch, outlet, distribution panel cover and downlights sit where the wiring was run (illustrative image) Finished (illustration)
The same hallway with the two ceiling downlights, fitted where the wiring was run, switched on (illustrative image) Lights on (illustration)
The entrance hallway of an apartment before the ceiling and walls are closed: switch and outlet boxes on the light gauge steel wall, cables for the downlights at the ceiling, and a labelled coil of cable where the unit’s distribution panel will go (illustrative image) Conduit and wiring (illustration)
The same spot at four stages of the work (illustration) Lights on (illustration) / inside the circle: conduit and wiring (illustration)
Choose a stage of the work

What we watch for in the parts that get hidden

  1. Switch and outlet boxes are fixed firmly to the framing
  2. Cables are secured at the required spacing, without damaging the sheath
  3. Each cable going to the apartment’s distribution panel is labelled with where it goes, then bundled
  4. At each light position, spare cable is left coiled for fitting the fixture

Once a building is finished, its electrical work disappears from view. That is why we take the most care with the parts that will be hidden. We want to leave a site where the next trade can work with ease.

Representative Director Esteban Sorani

How the work goes

  1. Orange CD conduit and boxes laid among the floor slab rebar (illustrative image)
    Illustrative image

    In-slab and in-wall conduit

    Before the concrete pour, we fix conduit and boxes in the floor and ceiling slabs and inside the walls.

  2. Cables fixed to the slab above the ceiling and run through a sleeve in the beam (illustrative image)
    Illustrative image

    Ceiling and partition wiring

    Once the formwork is removed we wire above the ceiling. Once the partition framing (LGS) is up, we fix boxes and wiring inside the walls. For low-voltage and fire-safety systems, our part is the conduit and wiring.

  3. A cable tray hung from the ceiling, with feeder cables bundled and fixed on it (illustrative image)
    Illustrative image

    Feeders and cable trays

    We install the cable trays, lay the feeder cables from the substation cubicle to the panels on each floor, then dress and fix them.

  4. Inside a distribution board during wiring (illustrative image)
    Illustrative image

    Substation and panel wiring

    We set the cubicle-type substation and the distribution boards, and connect everything from the incoming high-voltage cable to the feeders and each circuit.

  5. Downlights fitted in the ceiling (illustrative image)
    Illustrative image

    Fixture installation

    After the finishes, we install light fixtures, switches and outlets.

  6. Inspection and power-on

    We measure insulation resistance and earth resistance before energizing, then check voltage and phase rotation. Circuit by circuit we confirm the lighting and the outlet polarity, and the main contractor inspects the work.

    A distribution board with its door open, breakers on and the room lights on (illustrative image)
    Illustrative image
    1. Insulation resistance test
    2. Earth resistance test
    3. Voltage and phase rotation check
    4. Lighting test
    5. Outlet polarity check

We take on subcontract and contract work.

We take on work under contract from general contractors and first-tier subcontractors, and carry it out to the site schedule and safety paperwork.

Service area
Kanagawa, Chiba, Tokyo and Saitama
Buildings
Apartment buildings, commercial facilities, warehouses, factories, research facilities and hotels
How we are engaged
Contract work

When you get in touch, please tell us

  • Drawings
  • Schedule
  • Quantity sheets
  • Site location
  • Construction period
  • Scope of work
Subcontracting inquiries

Phone+81-463-51-6638Hours: weekdays 9:00 to 18:00 (JST)

E-mailinfo@soranice.com

Company

Japanese name
SORANI株式会社
English name
SORANI K.K.
Representative
Esteban Sorani, Representative Director
Address
91-1 Hirokawa, Kubota Heights 202, Hiratsuka, Kanagawa 259-1219, Japan
Established
March 16, 2021
History
August 2018: business founded as 空電設
March 2021: SORANI K.K. incorporated
Capital
1,000,000 yen
Employees
7 (as of October 2026)
Partner companies
25 (as of October 2026)
Business
Electrical installation work
Planning and development of software and apps for the construction industry
Construction business license
Governor of Kanagawa Prefecture, License (Han-5) No. 91054
Electrical construction business (ordinary license)
Electrical contractor notification
Deemed registered electrical contractor
Governor of Kanagawa Prefecture, Notification No. 20236009
Qualifications
First-Class Electrician: 1
Second-Class Electricians: 5
First-Class Electrical Construction Management Engineer: 1
High-Voltage Cable Work Skills Certification: 1
Insurance
Health insurance (Japan Health Insurance Association)
Employees’ pension insurance
Employment insurance
Workers’ accident compensation insurance
Invoice registration number
T9021001072431
Service area
Kanagawa, Chiba, Tokyo and Saitama
Phone / Fax
+81-463-51-6638
E-mail
info@soranice.com

Contact

Please call or e-mail us.

Phone

+81-463-51-6638

Hours: weekdays 9:00 to 18:00 (JST)

Fax: +81-463-51-6638 (same as phone)

If we are out on a job, we will call you back.

E-mail

How a request goes

  1. Inquiry
  2. Review of drawings, schedule and quantity sheets
  3. Quote
  4. Contract (purchase order and acknowledgment)
  5. Safety paperwork
  6. Start of work

We do not take requests from private individuals.